The warehouse is equipped with 30 000 m2 of front shelves and metal furniture
A self-supporting warehouse based on racks with a shuttle pallet handling system was built to fulfill the client's requests .
Advantages:
To implement the tasks set, the Laboratory was equipped with the following equipment:
It was necessary to equip warehouses in different regions (Vorkuta, Surgut, Yekaterinburg) for storing small-piece products, goods in boxes, as well as storing a small amount of goods on pallets. So that the storage space is used as efficiently as possible. Based on the tasks set by the customer, our specialists suggested installing a shelf mezzanine with the placement of light shelves on the second floor (QMS). And along some walls, install pallet racks and free-standing shelves. The total area of equipped 3 warehouses was ≈ 1500 sq. m.
To solve these tasks, pallet holders have been developed, which give them the correct direction vector when loading. Mobile racks on wheels with a load capacity of up to 6 tons are also used. To create this structure, a base was developed in the form of a platform to which the wheels are attached. A metal storage rack consists of cells with metal dividers. In each cell, a tray is installed to the full depth of the rack. For easy loading/unloading of sheet material, rollers are installed at the front of the rack.
To implement the client's requests, it was proposed to implement the following equipment based on the mezzanine structure:
The shelving structure combines lightweight shelf racks on the lower tier and 6 upper tiers of pallet storage. The lower tier is equipped with high-strength protective elements. To prevent small items from falling out, special metal panels have been developed that are attached to the side and back of the cell. For small-piece goods, cardboard boxes of a certain size with dividers inside are designed.To restrict access to individual SMK shelving units, doors were installed that are attached to the front shelving frames and locked with a key.
To fulfill the client's requests, it was proposed to install a 5-storey mezzanine on columns in the existing warehouse complex. The warehouse area of this facility was 4,608 sq. m., the shelving equipment itself occupied an area of 1,356. 57 sq. m., the construction height was 10,800 mm. Racks are a structure of 5 floors, with 3 tiers of storage on each floor. Front racks with a capacity of 972 pallets were also installed. The project implementation period was 2.5 months. The result was an increase in storage facilities and the transition to a modern accounting system.
Our clients are leaders in their field
We cooperate with leading companies and are happy to be their reliable partner.
FIRST certificates confirm that our products meet established quality and safety standards.
Leave a request
We will contact you as soon as you receive a message.
Leave a request
We will contact you as soon as you receive a message.
Добавлено в корзину