Mechanical engineering


The task is to equip a warehouse for storing parts. Flooring for high loads is required. The spare parts warehouse is equipped with 9 m high front racks with heavy load decking. Pallet limiters are installed on each suspended tier for safe operation of the warehouse. Increased room capacity through the use of height, as well as access to each SKU.
Read more


- 3 Kardex Shuttle XP700 cabinets installed
- There are 35 shelves installed in 1 cabinet
- The base area of 1 cabinet is 12.44 sq. m.
- Cabinet height 7.9 meters
- Total storage area in 1 car is 109.55 sq. m.