Task
Due to the specifics of the car manufacturing company, the installation of cantilever racks was required. It was also necessary to upgrade the existing front racks for selecting goods, increase warehouse productivity, speed up recruitment, and reduce costs.
Solution
2 lines of cantilever racks with a total length of 15 meters were installed. The height of the cantilever racks was 4.8 meters (5 tiers). In addition, gravity shelves with a total of 192 units are integrated into the existing front racks on the 4 lower tiers. Thus, the issue of organizing a selection zone has been resolved.
192 pcs of gravity shelves
Successfully equipped
2 m.
Height of the structure
Gravity shelves for a set of goods
Installed